No |
Project Description |
Client / Main Contractor |
Date |
|
1 |
MTRC SIL 913– Trackwork & OHL Installation for South Island Line Independent Checking Engineer | Alstom Hong Kong Ltd |
Oct – Dec 2016 |
|
2 |
MTRC SCL1120 – Trackwork & OHL Installation for Shatin Central Link – Independent Checking Engineer | Alstom Hong Kong Ltd |
April 2017/Oct 2019 |
|
3 |
Construction of Homeownership Scheme Development at Sheung Lok Street Lifting Operation Gandolas/Cranage Support |
Sun Fook Kong Construction Limited |
Feb 2018/Feb 2019 |
|
4 |
SSD513 – Construction of Columbarium and GOR Construction of Road & Drainage Work and Associated Permanent Work |
Leighton Contractors (Asia) Ltd |
Jul 2018/ Apr 2019 |
|
5 |
Contract No. NE/2017/07 - Crossbay link projects Temporary Work Designer |
China Road and Bridge Corporation |
Dec 2018~ On going |
|
6 |
Various tendering & A&A works design across Hong Kong i.e. Building boundary wall modification; school gate replacement; A&A Work, Signage Work, Demolition Work, Drainage Work & Repairing Work Designer for Permanenet & Temporary Work | Tin Hung Construction Co., Ltd /Tung Yat Construction Co, Ltd/Sheung Moon Construction Ltd/Sun Fook Kong Civil Ltd/Chit Cheung Construction limited / Lingma Construction & Engineering Limited | Dec 2018 ~ On going |
|
7 |
Solar Pannel Structural Design for Rooftop at village houses & buildings Permanent Work Designer | Solar Tech International Ltd |
Jan 2019~ On going |
|
8 |
P271 Capacity Enhancement Structural Terminal 1 & Annex Building Temporary Work Designer & Independent Checking Engineer | ATAL Engineering Group |
Mar 2019~ On going |
|
9 |
C1109 Stations and Tunnels of Kowloon City Section Minor Design Work - A&A Work [Limited support to Sub-contractor A&A Work, Contractor as-built drawing preparatrion and deisgn minor modification] Design Work & ICE Endorsment | Samsung - Hsin Chong Joint Venture / MTRC |
Jan 2019~ On going |
|
10 | CONTRACT C16W004 Baggage Handling System for Arrival Bagas Delivery and Early bags Storage Permanent Work Design - A&A Work | Siemens JEC | May 2019~on going | |
11 |
Detailed Design of RF Transmission Tower at Golden Hill Station Permanent Work Design | Newcom System Ltd |
July 2019 ~ Dec 2019 |
|
12 |
Contract No. 2534048: Private Developer: House development at 34 Mount Kellett Road, Hong Kong Temproary Work Designer & ICE |
Kin Shing Leung’s Building Contractors Limited |
August 2019~ On going |
|
13 |
Contract No. 2134: Private Developer: House development at 9A Discovery Bay, Hong Kong Independent Checking Engineer – Cladding / Façade Designer |
Sundart Holding Limited |
September 2019~ March 2020 |
|
14 |
Contract No.: ND/2019/06 – Fanling North New Development Area, Phase 1: Re-Provisioning of North District Temporary Wholesale Market for Agricultural Products. Project Planning & Claim support | New Concepts Engineering Development Ltd |
Oct 2019 ~ On going |
|
15 |
SCL1120B – Trackwork & OHL Installation for Shatin Central Link – Independent Checking Engineer | Effaige Tak Yu JV |
Dec 2019 ~ On going |
|
16 |
Design of Temporary Site Offices – Term Contract Structural Design Support |
Long Faith Engineering Ltd
|
Dec 2019 ~ on going |
|
17 |
108kW Photovoltaic System Project at Tseung Kwan O 400kV substation for CLP Power Hong Kong Limited Temporary Works Designer |
CLP Power Hong Kong Limited |
Feb 2020 ~ on going |